Mold Trial Time Shortening Technology for Aluminum Wheel Low-Pressure Casting
Conclusion: Pre-simulated flow field optimization reduces trial adjustment times.Data: CAE pre-simulation cuts mold trial batches by 50%. Explanation: Eliminates filling and solidification defects in advance.
Conclusion: Standardized parameter preset shortens debugging cycle. Data: Fixed wheel mold parameter database shortens trial time by 28%. Explanation: Avoids repeated parameter attempts.
Conclusion: Pre-optimized gating and riser structure reduces on-site modification. Data: Pre-optimized structure reduces on-site mold modification by 63%. Explanation: Eliminates structural defect adjustment links.
Conclusion: Integrated preheating system improves trial efficiency. Data: Synchronous mold preheating shortens preparation time by 35%. Explanation: Realizes one-time temperature reaching standard.
Conclusion: Unified auxiliary tooling matching saves docking time. Data: Special wheel mold tooling cuts docking debugging time by 41%. Explanation: Avoids tooling adaptation deviation.